{"updatedAt":"2026-11-16T16:58:33.056Z","items":[{"id":"unocoin-security-rebuild-2026-11-13","status":"watch","statusLabel":"SERVICE PAUSED","displayDate":"13 NOV 2026","title":"Unocoin rebuilds infrastructure before restoring services","fact":"Unocoin says platform services remain suspended while it rebuilds its server infrastructure, an exercise estimated on November 12 to take approximately four to five working days. Its November 13 update says BitGo confirmed the enterprise-account freeze worked as instructed, but the transactions under review were signed and broadcast externally and a BitGo multisignature-wallet backup mechanism appears to have been exploited. Root cause, exposure and any resulting cryptocurrency loss remain under investigation.","observation":"The restoration window is now documented; service return, root cause and the full financial impact remain open checkpoints.","sourceLabel":"Unocoin official incident timeline","sourceUrl":"https://blog.unocoin.com/unocoin-security-update-official-timeline-progress-updates/","lastVerified":"2026-11-13","promiseFileAvailable":true},{"id":"injective-safeharbor-upgrade-2026-11-11","status":"shipped","statusLabel":"SHIPPED","displayDate":"11 NOV 2026","title":"Injective completes expedited Safe Harbor upgrade","fact":"Injective's official upgrade portal marks v1.20.4-safeharbor.5 complete at halt block 191,270,000. The expedited upgrade followed a November 9 coordinated halt and an emergency v1.20.4-bl.3 patch after an AppHash mismatch; Injective says it prepares the network for a larger chain upgrade later this month.","observation":"The expedited upgrade is complete. The larger mainnet upgrade remains the next verifiable checkpoint.","sourceLabel":"Injective Chain Upgrades","sourceUrl":"https://chain-portal.injective.network/upgrades","lastVerified":"2026-11-11","promiseFileAvailable":true},{"id":"circle-usdc-xlayer-mint-burn-delays-2026-11-10","status":"shipped","statusLabel":"RESOLVED","displayDate":"11 NOV 2026","title":"Circle resolves USDC delays on X Layer","fact":"Circle marked the X Layer incident resolved at 00:15 UTC. The incident began at 22:54 UTC with delayed USDC mints and burns and was later expanded to include delayed USDC transactions through Circle Wallets.","observation":"The recovery arrived after 81 minutes; the incident now moves from live delay to permanent receipt.","sourceLabel":"Circle Status","sourceUrl":"https://status.circle.com/incidents/pqkg3v9wthj0","lastVerified":"2026-11-11","promiseFileAvailable":true},{"id":"kraken-multi-network-funding-delays-2026-11-10","status":"shipped","statusLabel":"RESOLVED","displayDate":"10 NOV 2026","title":"Kraken resolves broad multi-network funding delays","fact":"Kraken reported at 18:15 UTC that deposits and withdrawals could be delayed across 34 listed blockchain-network components. It identified the issue at 18:21 UTC and marked the incident resolved at 18:57 UTC.","observation":"The status page completed an entire delay cycle in 42 minutes; the receipt remains.","sourceLabel":"Kraken Status","sourceUrl":"https://status.kraken.com/incidents/wmfdhp7qc1xw","lastVerified":"2026-11-10","promiseFileAvailable":true},{"id":"bitvavo-crypto-transfer-delays","status":"shipped","statusLabel":"RESOLVED","displayDate":"7 NOV 2026","title":"Bitvavo clears crypto-transfer backlog","fact":"Bitvavo says crypto deposits and withdrawals are fully operational again and all queued transfers have been processed. It will contact customers by email if any transfer still requires manual review.","observation":"The backlog shipped before the roadmap committee could rename it a strategic queue.","sourceLabel":"Bitvavo Status","sourceUrl":"https://status.bitvavo.com/incidents/01M6KK0EZF5DQRJ50VGTP5TBZV","lastVerified":"2026-11-06","promiseFileAvailable":true},{"id":"paxos-crypto-deposit-delays","status":"shipped","statusLabel":"RESOLVED","displayDate":"4 NOV 2026","title":"Paxos clears delayed crypto deposits","fact":"Paxos says it deployed a fix at 22:01 UTC, all crypto deposits are operational, and all previously delayed deposits have been processed.","observation":"The deposit queue cleared before the incident deck finished loading.","sourceLabel":"Paxos Status","sourceUrl":"https://status.paxos.com/","lastVerified":"2026-11-05","promiseFileAvailable":true},{"id":"kraken-plaid-us-withdrawal-delays","status":"shipped","statusLabel":"RESOLVED","displayDate":"4 NOV 2026","title":"Kraken resolves Plaid US withdrawal delays","fact":"Kraken says the Plaid-related issue affecting some USD withdrawals through Instant Bank Transfers has been resolved. A fix was implemented at 17:58 UTC and the incident was marked resolved at 18:04 UTC.","observation":"The withdrawal queue completed its brief residency in strategic later.","sourceLabel":"Kraken Status","sourceUrl":"https://status.kraken.com/incidents/jkm5tq0rzsc3","lastVerified":"2026-11-04","promiseFileAvailable":true},{"id":"kraken-multi-network-funding-delays","status":"watch","statusLabel":"PARTIAL RECOVERY","displayDate":"6 NOV 2026","title":"Kraken restores five networks while funding delays remain","fact":"Kraken says normal deposit and withdrawal processing has been restored on Ink, Optimism, Unichain, Base and BNB Smart Chain. Remediation continues for the remaining affected networks, where deposits and withdrawals may still be delayed; other funding methods remain operational.","observation":"Five funding gateways have exited the delay queue while the remaining networks keep the incident roadmap active.","sourceLabel":"Kraken Status","sourceUrl":"https://status.kraken.com/incidents/lq19kjjg863l","lastVerified":"2026-11-07","promiseFileAvailable":true},{"id":"kraken-vaulta-funding-delays","status":"shipped","statusLabel":"RESOLVED","displayDate":"9 NOV 2026","title":"Kraken resolves Vaulta funding delays","fact":"Kraken marked the Vaulta funding-gateway incident resolved at 17:52 UTC after restoring deposits and monitoring an implemented fix. The incident had affected Vaulta deposits and withdrawals.","observation":"Both funding lanes have now exited the delay queue before management could schedule a lessons-learned pre-meeting.","sourceLabel":"Kraken Status","sourceUrl":"https://status.kraken.com/incidents/cyfkt3ylmm4t","lastVerified":"2026-11-09","promiseFileAvailable":true},{"id":"kraken-brl-pix-funding-delays","status":"shipped","statusLabel":"RESOLVED","displayDate":"11 NOV 2026","title":"Kraken resolves returned PIX withdrawal issue","fact":"Kraken marked the Brazilian real PIX withdrawal incident resolved at 02:33 UTC on November 11. The incident began on November 5 when PIX withdrawals were being rejected, after a separate PIX funding-delay incident had been resolved earlier that day.","observation":"PIX withdrawals completed the full record: delayed, resolved, delayed again, and resolved again.","sourceLabel":"Kraken Status","sourceUrl":"https://status.kraken.com/incidents/1mk59wfdjggk","lastVerified":"2026-11-11","promiseFileAvailable":true},{"id":"kucoin-ankr-deposits-paused","status":"date_removed","statusLabel":"NO RESTORE DATE","displayDate":"9 NOV 2026","title":"KuCoin pauses ANKR deposits without reopening time","fact":"KuCoin says it suspended deposits for Ankr Network (ANKR) because of essential maintenance. It did not provide a restoration time and says users will not receive a further announcement when the service is restored.","observation":"The deposit lane has reached peak roadmap efficiency: no reopening date and no sequel announcement.","sourceLabel":"KuCoin official announcement","sourceUrl":"https://www.kucoin.com/announcement/en-kucoin-has-temporarily-closed-the-deposit-service-of-ankr-network-ankr","lastVerified":"2026-11-10","promiseFileAvailable":true},{"id":"kucoin-air-deposits-paused","status":"date_removed","statusLabel":"NO RESTORE DATE","displayDate":"10 NOV 2026","title":"KuCoin pauses AIR deposits without reopening time","fact":"KuCoin says it temporarily closed deposits for AI Router Protocol (AIR) because of essential maintenance. It did not provide a restoration time and says it will not publish a further announcement when the service is restored.","observation":"The deposit lane now has no reopening date and no scheduled closing note for the delay record.","sourceLabel":"KuCoin official announcement","sourceUrl":"https://www.kucoin.com/announcement/en-kucoin-has-temporarily-closed-the-deposit-service-of-ai-router-protocol-air","lastVerified":"2026-11-10","promiseFileAvailable":true},{"id":"initia-l1-halt-rollup-key-incident","status":"date_removed","statusLabel":"NETWORK HALTED","displayDate":"10 NOV 2026","title":"Initia halts L1 after unauthorized transfers","fact":"Initia says it halted its L1 at 06:18 UTC after detecting unauthorized transfers from escrow accounts holding assets bridged to several rollups. Its initial investigation indicates compromised rollup infrastructure keys were used to fabricate IBC transfers; no restart time has been announced.","observation":"A temporary rollup pause has expanded into a full-network roadmap with no return date.","sourceLabel":"Initia official update","sourceUrl":"https://x.com/initia/status/2120050740626628972","lastVerified":"2026-11-10","promiseFileAvailable":true},{"id":"luno-crypto-send-delays","status":"shipped","statusLabel":"RESOLVED","displayDate":"6 NOV 2026","title":"Luno resolves recurring crypto-send delays","fact":"Luno marked its crypto-send incident resolved at 11:56 UTC on November 6 and says sends are working normally. Customers whose sends failed or were delayed can try again.","observation":"The recurring delay has completed its second journey through the resolution pipeline.","sourceLabel":"Luno Status","sourceUrl":"https://status.luno.com/incidents/89q41hrmyhn6","lastVerified":"2026-11-06","promiseFileAvailable":true},{"id":"luno-exchange-order-update-delays","status":"shipped","statusLabel":"RESOLVED","displayDate":"6 NOV 2026","title":"Luno resolves delayed exchange order updates","fact":"Luno marked the delayed exchange-order-update incident resolved at 07:04 UTC. The incident had not affected trading, order matching, account balances, or the Luno app and website.","observation":"The paperwork has caught up with the trades and left the revised roadmap unopened.","sourceLabel":"Luno Status","sourceUrl":"https://status.luno.com/incidents/r4cr529dgjfm","lastVerified":"2026-11-06","promiseFileAvailable":true},{"id":"binance-withdrawal-resumption","status":"watch","statusLabel":"PARTIAL RECOVERY","displayDate":"13 NOV 2026","title":"Binance completes asset coverage while withdrawals reopen in phases","fact":"Binance says it has completed coverage of more than $6.34 billion in assets affected by the October 30 security incident. It published a Proof of Reserves snapshot taken November 12 at 00:00 UTC covering 198 tokens; the full zero-knowledge proof is expected after approximately 40 to 50 hours. Withdrawals continue to reopen in phases, and Binance says it will replenish SAFU to approximately $1 billion.","observation":"Asset coverage is complete; independent proof generation and full withdrawal restoration remain the next verifiable checkpoints.","sourceLabel":"Binance official announcement","sourceUrl":"https://www.binance.com/en/square/post/387527915100533","lastVerified":"2026-11-13","promiseFileAvailable":true},{"id":"umx-six-perpetual-contracts","status":"date_removed","statusLabel":"DATE REMOVED","displayDate":"30 OCT 2026","title":"UMX postpones six perpetual-contract launches","fact":"UMX postponed the 08:30 UTC launches of six USDT-margined perpetual contracts—XPIN, BAT, ERA, B2, JCT, and AIN—to support trading-system stability. It has not announced replacement launch times.","observation":"Six contracts have entered the premium pre-launch state: scheduled without a schedule.","sourceLabel":"UMX official announcement","sourceUrl":"https://support.umx.com/hc/en-us/articles/18193665460879-UMX-to-Postpone-the-Launch-of-Multiple-USDT-Margined-Perpetual-Contracts-October-30-2026","lastVerified":"2026-10-30","promiseFileAvailable":true},{"id":"graniteshares-3x-crypto-etfs","status":"scheduled","statusLabel":"SCHEDULED","displayDate":"30 NOV 2026","title":"GraniteShares 3x crypto ETF registrations delayed","fact":"An SEC filing dated October 26 designates November 30, 2026 as the new effective date for registration amendments covering eight 3x long and short daily ETFs tied to bitcoin, ether, solana, and XRP.","observation":"Eight leveraged calendars have been consolidated into one larger calendar.","sourceLabel":"SEC EDGAR filing","sourceUrl":"https://www.sec.gov/Archives/edgar/data/1689873/000149315226048400/form485bxt.htm","lastVerified":"2026-10-27","promiseFileAvailable":true},{"id":"ethereum-glamsterdam-hoodi","status":"date_removed","statusLabel":"DATE REMOVED","displayDate":"7 NOV 2026","title":"Ethereum keeps Glamsterdam off Hoodi","fact":"Ethereum developers are delaying the Glamsterdam hardfork process and will not activate it on Hoodi until issues involving invariants broken by EIP-8037 and EIP-8038 are resolved. Audits and developer checks are continuing; no replacement activation date was announced.","observation":"The test now enjoys Ethereum’s most scalable resource: additional time.","sourceLabel":"Ethereum Foundation R&D update","sourceUrl":"https://blog.ethereum.org/en/2026/11/06/glamsterdam-8037-8038","lastVerified":"2026-11-07","promiseFileAvailable":true},{"id":"zcash-nu7","status":"shipped","statusLabel":"SHIPPED","displayDate":"6 NOV 2026","title":"Zcash NU7 activates on mainnet","fact":"Zcash mainnet reached NU7 activation block 3,543,405. The upgrade reduces the block target spacing from 75 seconds to 25 and introduces a fee reserve that pays miners gradually.","observation":"A roadmap item reached production before the observation committee could extend it.","sourceLabel":"ZecBlock","sourceUrl":"https://zecblock.com/block/3543405","lastVerified":"2026-11-06","promiseFileAvailable":true},{"id":"stellar-protocol-30","status":"watch","statusLabel":"WATCH","displayDate":"NOV 2026","title":"Stellar Protocol 30 transition","fact":"The upgrade changes ledger headers; older SDKs may fail to decode new ledgers. Infrastructure operators need compatible software before the validator vote.","observation":"Compatibility is the stage where ‘future-ready’ meets an old parser.","sourceLabel":"Official upgrade guide","sourceUrl":"https://stellar.org/blog/developers/bell-protocol-30-upgrade-guide","lastVerified":"2026-10-23","promiseFileAvailable":true},{"id":"enjin-fort-canning-matrixchain","status":"shipped","statusLabel":"SHIPPED","displayDate":"16 NOV 2026","title":"Enjin Fort Canning activates on Matrixchain","fact":"Enjin targeted Matrixchain block 12,319,600 for the Fort Canning runtime upgrade on November 16. The chain produced that block at 15:40:12 UTC (10:40:12 a.m. ET), and Enjin’s live Matrixchain RPC now reports spec version 1043 and transaction version 16, matching the published plan. The marketplace reopening after its migration remains the next operational check.","observation":"The announced block arrived; the remaining receipt is the marketplace’s return from migration.","sourceLabel":"Enjin changelog and Matrixchain RPC","sourceUrl":"https://enjin.io/changelog/fort-canning/","lastVerified":"2026-11-16","promiseFileAvailable":true}]}